REGINA GARDENS 1 NEWS: LATEST UPDATE 02.06.2026
EGM is around the corner and OMC would like to update owners on rules for voting and participation.
Storm Varvara consequences
Storm Varvara 07.10 did not do any damage to the complex, but showed potential problems.
Bin stickers
All green bins have been stickered to make it clear what garbage they are intended for.
Solar lights on Block 8 (Gate B)
Vesta will be installing solar lights on Bock 8 (close to Gate B).
How to avoid future flooding?!
OMC is worried about possibility for future flooding of RG1 if we do not take preventive measures.
Manifolds in blocks are being replaced!
According to instructions from Water Board Authority manifolds in blocks are being replaced.
Safety regulations for lifts!
Due to a number of incidents a set of safety regulations for lifts are created by the OMC.
Controlling of population of stray cats!
Please read this article to get information about ongoing project to control population of cats .
Children´s safety!
Please read included important document regarding children´s safety in Regina.
Zoonotic Disease!
Please read included article about what diseases could be passed from wild cats to humans.
Key boxes are installed on roof doors!
All doors leading to roofs in blocks got locks and key-boxes.
Signs updated!
All signs around pools have been updated, and some old signs have been removed to make area more tidy.
Pools are open!
Season 2025 is opened as of 01.05.2025.
All facilities are ready for owners and their guests rest and enjoyment.
Walking with dogs in Regina!
Please read included article about walking with dogs in Regina Gardens.
Coverage after storm
We have received over 70% coverage of expenses connected to storm 02.11.2024
Updated version of maintenance plan for Regina
New version is out, with received feedbacks & suggestions.
Please, use pedestrian gates
Many pedestrians are using car gates instead of pedestrian gates. Please, stop doing that!
Maintenance plan for Regina
We would like to get your feedbacks on the maintenance plan for Regina.
Cleaning of roof drains!
Vesta is to clean all roof drains in Regina and needs consent from Villa owners.
Inspection of roof drains!
Vesta is instructed to inspect all roof drains of all properties in Regina.
Painting project clarification!
OMC would like to give some clarifications due to questions from owners.
Regina is recovering!
Step by step Regina is being taken back to the looks & order we are used to.
Recovery have started!
Big thanks to inhabitants of Block 7 who by own initiative washed their entrance.
Hurricane Photos!
Photos page is updated with photos of situation in Regina during and after the hurricane.
No car washing in Regina!
We would like to remind that washing of cars inside Regina is prohibited. We follow general Cyprus rules.
Gate C is out of operation!
Gate C is out of operation due to a damage. Vesta & gate supplier are notified, we hope for a quick repair.
Road works close to Gate B!
EAC had to dig up our road to connect new buildings to substation on our premises.
Road speed signs are in place!
We hope that new signs will help to improve speeding situation in Regina.
Simple parking rule!
As a courtesy to your neighbor, please try to position your entire car between the parking lines. It`s really not difficult.
Gate repairs started!
Thanks to Vesta & Costas for starting works on damaged gates. Gate pole and one section have been repaired.
Lighting improvement!
OMC have acquired a number of solar lights to improve lighting conditions & safety around townhouses.
Gate A damaged!
Be aware: Gate A have been damaged by garbage truck. Security of Regina is reduced.
Work planning!
OMC initiated meetings with Vesta to create detailed work plans for end of 2024 and 2025.
Color advice!
Are you planning to repair & paint your property? Please read this article to make sure you choose correct color.
Pool rules!
We would again like to stress some points from basic pool rules, as we still see unacceptable behavior in the pools area.
Gates security
Security of Gate B have been improved after discovering that it could be opened with a credit card.
Children`s pool closed!
Children’s pool is closed following a human deposit being found in the pool.
Gates are being painted!
All gates are being painted by Vesta Holidays as a part of maintenance of Regina Gardens.
Poo by the pool!
Today is second time within 2 weeks dog poo was found within a meter of the pool. This has to stop!
Q&A about Green Fence!
Due to misleading rumors OMC would like to state & repeat some facts about this project.
Road works update!
Road works are moving forward. Drainage channel is improved and parking bays are being marked.
Green fence project!
Please read an update on status of the Green Fence project and how to participate in it.
This is illegal!
We remind that it is illegal to run a business which uses common areas (like keeping rental cars on public parking places) in Regina gardens.
What is wrong with people?
How can someone find it normal to let his / her dog do it`s business on others property?
From now on owners responsible for such actions will be found and reported to authorities.
Nearly there ...
We are waiting for Vesta to finalize work they have started and to clean up where they have finished.
Gate C was tampered with
Someone cut off electricity to Gate C which left it open. OMC again reminds Vesta that all electricity rooms have to be locked off.
This is not how it should be done
Despite many requests to stop, we still see dumping of garbage. Responsible will be found and will have to pay for removal.
It`s summer, but OMC is not on vacation :)
A few updates on ongoing works around Regina in the news
Pay attention to the speed limit
It is a speed limit of 15 km/h in Regina Gardens. Please, respect that.
Status around remaining road works!
Please read an update around status of remaining road works (sewer man holes and markings)
Sunbeds are not there to be jumped on!
Again we get reports of children jumping on sunbeds. Please read included circular.
Lighting in Block 5
It is illegal to tamper with electricity in public areas.
Please read included circular.
Recycling
We see people throwing rubbish in wrong bins. Please read included circular about proper use.
Private sunbeds - last warning!
A number of private sunbeds left around pool B over winter risk to be disposed of. Deadline: 31.05.
Small pool is now clean!
Blockage in the pump has been fixed today morning and pool is now being cleaned and is soon ready to be used.
New Season has started!
We start a new season with a number of visual & technical improvements to common areas.
Circular regarding gates!
Please read included circular about usage of pedestrian/vehicle gates.
Bulbs changed!
Old bulbs around blocks 5 & 6 are now changed, improving lighting conditions and safety.
Repairing for Pool A toilets and showers!
Room is under repair after this years flood to have everything ready by the season start 1 of May.
Reminder about Blowers!
Please remember that use of blowers is prohibited, for the sake of noise & pollution.
Spring is around the corner!
We are getting Regina ready for 2024 season. Please read this short update on what is going on.
Dry river improved
New areas of dry river around Pool A are now made nice with wonderful flowers.
Good progess with new fence
End of day 2, and 26 sections (around 25-30%) of the fence are in place.
New fence!
Installation of the new fence have started. A long awaited security improvement for whole Regina.
Tree trimming!
Preparations are being done for fence installation. Trees are being trimmed to make space for new fence.
Empty Pool A!
Please read included reminder about Pool A. Be careful - Pool is now empty. Watch your children.
Pool A Maintenance!
Pool A will be drained week 3 (starting 15`th of January) for repairs to the tiles and grouting.
Damages after heavy rain
Last weeks heavy rains flooded pool pump room and toilets. Please read news about this incident
AGM Results
AGM was held 21.11.2023. Please read this news article with information about results.
Road repair status!
Please read this news article for latest update on road repair project status.
AGM Agenda!
Please see included agenda for AGM 14/21 November. Supporting documents will be circulated by direct e-mail to owners.
New debt recovery!
We are getting 1 300,- EUR back due to sale of B1-204. We are happy to see that list of long term debtors is getting shorter and shorter and is contributing to our abilities to improve RG1 without asking for additional funds from current owners.
Hatches are repaired!
OMC & Vesta are working closely together these days through a list of 42 points which require attention after last week's roadworks. But other matters are not forgotten: 2 damaged hatches were on top of our list for 2 weeks and are now repaired. Happy & safe walking around RG1 :)
Works continue 06.11.2023
OMC, Vesta and contractor had a meeting today, and works continue on Monday 06.11.2023.
Road repair status
OMC is working closely with Vesta to finalize road repair project according to our standards and expectations. Please see updated status in news.
Club house area finished
Empty area behind the Club House is finally finished, making this area much nicer. See photos here.
Road repairs
Road repairs have started, addressing a number of current issues. Please, see included photos.
Children & pets @ RG1
We are getting continuous complains about unruly, unsupervised children. Please read attached notice.
October Newsletter
October newsletter from OMC is now available online and is also placed around RG1.
Pets in RG1
We see an increasing amount of pets in RG1 and increased amount of complains to VH & OMC. Please, read included letter from Vesta.
Remember Info-boards!
OMC is regularly publishing important information on our 7 info-boards. Please, check them when passing by.
Important information from OMC!
Please read included letter with information around ongoing projects.
Plaques on benches!
Metal plaques are fitted to the wooden benches to remind users of the origin of this gift.
Wild dogs 2!
We are working on a permanent fence which will potentially reduce dog problem. Read more in news.
Wild dogs!
Wild dogs have been observed (and chased away) in Regina today. Please, be aware and notify Vesta immediately if they are seen again.
New umbrallas around pools!
We are happy to inform that new umbrellas are installed around both pools to provide more sitting places with shade.
Garbage near B4!
Owner of the garbage has been found, and pile will be removed 4`th of july. An excellent example to follow!
Gate B fence is improved!
Temporary fence on the right side of Gate B is now replaced with a nice permanent fence.
Don`t forget your wristband!
Please read included circular concerning wristbands (reasons & rules)
New signs around pools
Old signs have been replaced with new around pools. Looks nice, and make important information easily available. Thanks to Vesta for taking care!
Garden works in June
Around 30 trees are being trimmed (and some cut) to make Regina look beautiful before summer holidays
Gift from original owners
These beautiful benches are a gift from original owners in Regina Gardens. Please, enjoy and take care.
Swimming pool safety message!
Children under the age of 12 must be supervised in and around the pools at all times!
Stones in the pool
It is with dismay that the OMC has to report that large stones are again being thrown into swimming pools on Regina 1
We love our gardens
Gardens are back in Regina Gardens :) Check out transformation in just 1,5 year!
Dry River project
We have finalized first stage of Dry River project. Over 100 plants are planted transforming 4 areas of empty river to a river of flowers.
Check and repair of sunbeds
All sunbeds were checked and repair works have started. Broken will be removed asap.
Who is stealing our bulbs?!
Not to give anyone a bright idea, but someone is actually stealing bulbs from lights around Regina..
Fence on kiosk side!
Fence on the kiosk side is now finished. 75 meters of additional security against unwanted visitors.
Traffic rules in Regina!
Please respect that Regina Gardens is a residental area with a speed limit of 20kph and full priority for pedestrians.
Lift Certification!
All required lift inspections and tests were carried out in March 2023 and certificates have been issued which are valid until March 2025.
Newsletter for march!
Please have a look at our march newsletter to get an update around OMC work.
Rocks in Pool B!
It has came to our attention that someone has been throwing rocks into Pool B. This can potentially be highly costly for all of us!
Note from OMC about complex security!
Please read information and appeal from OMC about security situation in Regina.
Pool shower and toilets closed!
Due to someone`s unfortunate behavior we have to close the pool shower and toilet blocks!
Significant financial news!
The OMC is very pleased to announce two major changes to our financial position!
Bulbs changed!
Yesterday evening VH changed a number of non-working bulbs after a request from OMC!
Unwanted incident? We need to know!
We appeal to owners to inform OMC and Vesta about all unwanted incidents in our complex.
Unexpected gift from initial owners of RG1!
OMC was today presented with an unexpected gift from original owners of RG1. Read more in news!
Newsletter January 2023!
Please have a look at our january newsletter to get an update around OMC work.
Lets keep pool areas tidy!
It is an increasing amount of displeasure among owners due to shabby and unkempt private sun beds left around the pool areas.
Cost reduction measures!
A couple of cost reduction measures have put in place. Read more in news.
Temporary fence in place!
Temporary fence @ Hilltop side is in place. It will provide additional security to RG1 during building process.
Merry Christmas & Happy New Year!
We would like to send our best wishes to all owners of RG1 and Vesta Holidays.
New plants in place!
New plants are planted in both big grass areas. We hope that all owners like this small improvement.
New lamps are being installed!
Areas from M68 to V9 are getting new lamps installed to give more light to areas.
Merry Christmas from VH!
Christmas comes early this year! Vesta Holidays are painting bridges & umbrellas (among many other things) as their Xmas present to all owners.
Do you have a satellite dish?
Owners of satellite dishes in apartments blocks are requested to inform Vesta Holidays if you are an owner of a dish, and if it is in use or not!
Clean up after your pets!
We have received a number reports of owners allowing their dogs to foul in the common areas. This is strictly prohibited and will be reacted on!
Garden improvement
2 grass areas are getting some more flowers & dry levantas will be replaced withing next 2 weeks.
One to go
This open space will be closed with a temporary fence. Offer is approved, and we are waiting for Vesta Holidays to do required pre-payment.
Use of emergency services!
When emergency services are needed, time is usually of the essence. Please, read this information to be prepared.
Good news! Reduction in water costs
We are pleased to report that in 2022 there was a reduction of €3,023 in the cost of water, indicating that investing in this system has paid for itself within 12 months.
Increased fire safety!
RG1 is now registered with the Fire Department, and they can gain access through any gate if they are called in an emergency.
Ready for Winter!
Wooden boxes which house electronic equipment for gates operation are prepared for the rain season. Now with roofs and painted.
Insurance payment received
Full insurance payment of 1850,- EUR (+VAT) was received by Vesta Holidays today, 23.11.2022. Owners will not need to pay anything for this repair.
New Committee in place
New committee for the period of 2022 - 2023 was elected on the AGM meeting 14.11.2022. Read more in news.
News archive:
BIG TRIM COMPLETE
Cutting, trimming and cleaning of the area from M68 all the way to the end of Block 2 took place and was recently just completed.
17 palms have been trimmed as well.
PAINTING FUNDS COLLECTION
In the document attached below you can find the latest information about painting fund collections and OMC members.
Newsletter RG1 October 2022
Please find attached the latest October newsletter for our beloved project.
MAIN GATES DAMAGE
On 05.10.2022 at about 09.30am, main car gate to RG1 was very seriously damaged by one of our neighbors.
OMC immediately informed the Insurance company CNP in written form. VH informed the Police. Records of the case are available from witnesses and cameras.
CNP asked us not to move or remove any part of gate until their experts have concluded all the necessary investigations. CNP is already in contact with the Insurance company handling the vehicle on the neighbor who did the damage.
CNP’s protocol was documented on the 07.10.22. Personnel of the other company “Anytime” inspected the gate on 11.10.2022.
Only after the insurance companies are done, Metal Tec. Can repair the gates. The opening Mechanism of the gates is fully broken and has to be replaced with a new one. The metal frames will be repaired.
We got a quotation on the 14.10.2022. Cost = 1850.00 Euros plus VAT. Information was sent by OMC to CNP.
Plan is to finish the repairs and put gates into operation next week, till 21.10.2022.
VERY IMPORTANT INFORMATION ABOUT THE FUNCTIONING OF THE GATES
Since the implementation of the gates system, some owners have experienced confusion, which is normal. We have created this Informational PDF file that containts answers and clarifications to questions you may have or may not have yet.
Please make sure to check it out by pressing the button below.
⇩
⇩
⇩
⇩
⇩
INDICATIONS
To ensure the safety of vehicles and that of the gates, certain indications were installed.
Stop lines – do not cross while gates are opening. It will secure vehicles and gates from any damages and problems.
Warning sign – our complex is equipped with cameras. Any damage of the common and private property will be reported to the Police.
More PHOTOS
⇩
⇩
⇩
⇩
⇩
LEAF BLOWERS
Dear Owners, the use of leaf blowers for the cleaning of the any part of the territory of Regina Gardens 1 is strictly
prohibited.
Blower could be used only by trained gardeners to clean green areas and areas around plants.
Using of blowers by workers and cleaners to “clean’ roads and pass ways means blowing dust from
roads into apartments and gardens of Owners.
It is not cleaning – it is polluting of Owners properties and spoiling of Owners health!
Please report all cases of anyone using of blowers to Vesta Holidays ([email protected] and
Owners Committee (OMC RG1) ([email protected]).
Only together we can make RG1 and our Properties clean and do it without noise and clouds of dust.
GATES ARE OPERATIONAL EVERYWHERE
As security was voted to be the number 1 concern of the society, the OMC worked tirelessly to see the gates be installed together with a CCTV monitoring system.
Now that these 2 steps have been completed, the OMC will be able to focus on the next steps, such as covering easy to enter spots from the sides of the complex to further enhance security. Together with that, the OMC will also be able to focus on various aesthetic/cleanliness aspects of the project so it can be helped further rejuvenate.
The OMC thanks all the residents for their support, understanding and ideas so far, and look forward to the next steps that need to be undertaken.
Click PHOTOS to see images of all the gates.
LATEST DEBTOR INFO
We thank all the owners who came forward and helped lessen the gap on the outstanding debts.
Only as a community we truly progress and make our RG1 great.
Please open document from link below!
⇩
⇩
⇩
⇩
GATES - PROGRESS
1. According to plan around the 15.07.2022 the 4 major gates have to be installed.
2. Currently 13.07.2022 – Gates are being installed within schedule.
3. Vehicle noise levels have dropped by half as the complex is no longer used as a shortcut to other locations.
4. Less foreign vehicles passing by the complex, less road damages and thus lowered future costs.
5. When everything is fully functional, it will further reduce unnecessary traffic within, and also hopefully aid with the important matter of security.
CCTV INSTALLATION APROXIMATE TIMELINE UPDATE
As per the latest community vote, the installation of a CCTV monitoring system is in the works and will begin around the 15th of July.
As the monitoring system installation progresses, it will be accompanied by the long awaited gates at all entrances of the project.
FOR FULL INSTALLATION TIMELINE PRESS BUTTON BELOW
⇩
⇩
⇩
GATES GO LIVE
After a lot of hard work, countless meetings and negotiations, we have managed to reach the final point for successful operation of the gates for RG1.
This is a essential step to improve the security of the complex and also massively decrease the amount of unwelcome vehicles and passerby's.
To obtain your Remote Controls visit Vesta Holidays offices.
For the codes and gate numbers, your should check the emails VH has sent you recently.
For leaflet click below.
BINS FOR PLASTIC AND PAPER
A new bin ONLY FOR PAPER has been placed near the VH club, and also a 2nd and new bin for PLASTICS has been added as well.
CAT RESTROOM PREVENTION
As of last week, the sign holding area near pool A has been filled with gravel which will prevent cats from using the ground as a restroom.
This will consequently prevent bad odors from being formed in this area.
NEWSLETTER MAY 2022
Further to the recent Extraordinary General Meeting (EGM) an update below on activity for Regina Gardens 1.
In order:
Camera
Lifeguards/ Wristbands
Debtors
Recycling
INFO ON SEPA PAYMENTS FOR COMMUNAL FEES
A letter from the Treasurer Karen B. to the residents regarding the matter of SEPA payments which makes the whole process of paying for communal fees significantly easier and more efficient regardless of the owners location at the time of payment.
GARBAGE DISPOSAL NOTICE
Residents from block 5 AND 6 are regularly disposing of their trash NEAR the trash bins and NOT inside, as seen on the photos above.
Additionally, due to disposing of NON-STANDARD waste like furniture, mattresses, construction materials and other similar items which are not accepted by the refuse authority's vehicles, the rest of the residents are overcharged for the NON-STANDARD refuse collection performed by Vesta, as there is no other way to dispose of the said refuse.
Owners are respectfully asked to take NON-STANDARD refuse to the municipality designated collection points.
Click below for FULL INFO ON DISPOSAL LOCATION.
POOLS OFFICIALLY OPEN
THE POOLS WILL BE OPEN
From 01.05.2022 until 31.10.2022
LIFEGUARDS WILL BE ON DUTY
From 10 AM till 6 PM
EVERY DAY
(Outside of these hours the pools will be closed*)
Do not forget to wear your personal WRISTBAND.
NOTE: Children under 12 are to be accompanied by adults, and do not need to wear wristbands. Children over 12 can attend unaccompanied and MUST wear theirs.
HAPPY HOLIDAYS
OMC and VH RG1
APRIL 12 MEETING OUTCOME
The 2nd residential meeting was held on the 12th of April 2022 and an almost unanimous vote was reached to successfully implement NEW modern security measures to further protect the complex as an initial step. Later steps will include re-painting and fixing of the roads.
In this LINK you can find the voting form and other important documents.
Click the button below for the latest NEWSLETTER of 2022.
REGINA 1 CLEANING SCHEDULE
Our neighbors and co-residents have reached out to the OMC to ask about the cleaning schedules of RG1.
The OMC was also asked to step in and try to improve the efficiency of the cleaning efforts.
We have further discussed the matter with VH and have posted here the schedule that is officially being followed by the VH personnel.
We hope to have already observed improvements and to see more coming.
NEW SIGNS
A big informational board was placed at the entrance of RG1 near the VH club house.
Additionally, for the the safety of all residents, young and not so young, safety signs were places in various locations of the project. Hopefully they should remind everyone to follow the basic movement rules that can help create a more peaceful community.
The BLUE sign represents "Living Area" and is a universal sign used all around the world and stands for:
- Max Vehicle speed 20kmh
- Pedestrians have absolute priority
- Car engines should be OFF when not moving
RG1 DEBTOR UPDATES
Debtors are those owners in RG1 who owe money to the rest of the owners of RG 1, in respect of arrears associated with levies/fees on their properties.
By recovering the outstanding debts we are able to increase the funds that enable works to be carried out for the improvement of RG1, and ensure a stable financial position for the complex.
For FULL article and information, please press MORE below.
NEIGHBORS REQUEST FROM 3 YEARS FULFILLED!
Long awaiting (3 years) request of some of our neighbors, was finally fulfilled yesterday.
The requested Information boards have been relocated to a new and much better position.
NEW INSURANCE
After weeks of negotiations with insurance companies, we have finally managed to arrange a significantly better deal for our complex.
The new insurance is with the CNP group and it will have the same yearly price as the old insurance used to have.
The main differences are that the old insurance covered only up to €0.5m in damages, while the NEW insurance will cover up to €1.5m in damages, plus a few more improvements regarding fires and other possible damages.
START OF LONG AWAITED GARDENS RENOVATION
The 24th of November 2021, marks the beginning of the RG1 garden renovations.
That includes a new more economic irrigation system and other approaches to make everything more efficient and better looking.
The currently implemented upgrades will return the investment within 2 year. Leaving us with the new gardens and lower annual fees afterwards.
INFO BOARDS
Information boards have been successfully placed in all major entrances of RG1.
The information they contain on at the point of this writing (12/11/2021) is:
1. Information that % for debts is introduced from 01.01.2022 and possible means to pay.
2. Rules for using the pools.
3. Information about the “Recycling station”
4. Useful phone numbers and addresses.
5. Last “Information letter”.
THIS JUST IN:
As a result of negotiations between OMC and Vesta Holidays (VH) on 27/09/2021, it is concluded that as of the 28/09/2021, VH vehicles will no longer be riding trough Regina Gardens 1 streets.
VH work vehicles will only be allowed to pass through the main entrance/exit in front of the Club House, when there is work necessary to be done.
The Owners and new Committee would like to share their sincere thanks to VH for their understanding, and especially thank Mr. A. Demou and C. Koliaros for their professionalism!
The complex now feels much quieter already :)
RAT MEASURES:
On the 13th of October, a pest control unit to inspected the areas affected by pests and took the according measures.
They placed 15 anti-rat contraptions where they were necessary.
Please note that the anti-rat contraptions will not be dangerous for other animals.
The cost of everything is 150€.
For photos of contraptions please click link below.
GARDENS AND GREEN AREAS:
The chairman of the new Committee, Alex Uzhanov, has negotiated with Mrs. A. Dorina of Vesta Holidays, that by the 7th of November 2021, a new landscape transformation will be made.
The plan will include all the necessary changes to reduce the amount of water consumed, and also beautify the whole area.
The new plan will cut shared owner costs and highly improve the landscapes.
For more information please click FULL INFO.
LITTLE BUT GROWING
As per Vestas positive and collaboration oriented spirit, they have been slowly but steadily working with the OMC, on fixing smaller and larger issues around the complex.
The latest fixes were the hole on one of the sewage lids near M2 & M3, which was potentially dangerous.
Additionally, Vesta fixed a water hose that had been damaged an leaking all over the concrete around it.
For photos, click below:
11TH OCTOBER 2021 MEETING MINUTES
The committee and all the owners who could attend, held an informal meeting around the pool to discuss various questions and suggest improvements.
To read the full MINUTES of the meeting, please click the MINUTES button below.
YOUR RIGHT TO KNOW:
As per orders of the old Committee, pine trees around the area of Pool B are supposed to be CUT.
The new Committee has intervened and managed to prevent this with an alternative solution!
Press the button below to READ MORE.
11TH OCTOBER 2021 MEETING EXTRA
During the informal meeting on the 11th of October, some questions were raised by one of the owners. The OMC answered all of them as best as they could.
TREES PROCESSED
The reorganization and trimming of the pine trees around pool B and along the back side of M1 – M5 has been conducted. It finally looks better, cleaner and safer.
All Owners complains have been sorted out.
ONE tree has been removed as per the recommendation and legal permission of the forestry department, since it was very old and was falling apart.
ADDITIONAL NEWS
November 2021 NEWSLETTER
Here you can find the official newsletter that was emailed to all the residents.
Thank you.
П.С. Русский перевод под Aнглийской версией.
About
This page was freshly built with the purpose to have the latest updates on developments and upcoming events that affect all owners.
The Project
Our Regina Gardens is a beautiful international community of kind people from all around the world.